Centre City Tower

Location:

City Centre, Birmingham

Contract Value:

£ 408,000

M&E Consultant:

EDCM (Performance Specification)

McDowall Air Conditioning refurbished the 4th, 5th, 6th, 7th & 8th floor office spaces, replacing the existing 25 year old perimeter induction systems on a phased floor by floor basis over 16 weeks.

The contract included the use of the largest mobile crane in Europe and each floor was provided with Mitsubishi Electric City Multi VRF systems with modified central plant fresh air ventilation to the back of each FCU.

  • 16 No. Void mounted ducted fan coil units per floor connecting to
  • 2 No. Heat Recovery VRF condensing units per floor
  • Associated automatic controls/ testing & commissioning
  • Full operation & maintenance documentation
  • Core mechanical services associated with each floor refurbished

 